Causes of water accumulation in converter furnace

(1) The oxygen gun, flue, smoke hood, furnace mouth water tank, etc. have been used for a long time and the equipment has aged.

(2) During the blowing process, the oxygen gun stays at a too low position for a long time, causing burn-through.

(3) The water tank at the furnace mouth is leaking due to collision and impact of flue slag, furnace dismantling machine, etc.

(4) Insufficient cooling water supply for the oxygen gun, flue, smoke hood, furnace mouth water tank, etc., resulting in poor cooling effect.

(5) During the process of dumping the furnace and tapping steel, due to the large angle, the molten steel burns through the furnace mouth and even causes an explosion.

converter furnace lining
converter furnace lining

Handling of water accumulation in converter furnace

(1) During the blowing process, if the operator finds that the flame is abnormal and suspects that there is water in the furnace, he should stop blowing with the gun, and after confirming that there is water in the furnace, he should not move the furnace, and quickly cut off the converter operating power supply and high-pressure water valve. The oxygen gun operator should monitor in front of the operating table. The inspection personnel should confirm and close the high-pressure and medium-pressure water valves, and organize all personnel around the converter to evacuate 20 meters away. It is strictly forbidden for irrelevant personnel to enter the converter area until normal production is resumed.

(2) Confirm water accumulation in the furnace: The initial confirmation should be jointly confirmed by the team leader and the furnace shaker at the nitrogen seal port (the oxygen gun operator must not leave the workbench). If it is confirmed that there is no water, first tilt the furnace and shake it backward to confirm whether there is any abnormality, then shake the furnace forward and confirm the furnace status again. If there is no abnormality, normal smelting can be carried out. If it is impossible to accurately confirm, the on-duty dispatcher should be notified immediately, and the on-duty dispatcher should notify the operation manager and the on-site inspection personnel to come to the site for joint confirmation. After jointly confirming that there is no water, the dispatcher will issue a continuous smelting instruction, shake the furnace backward and forward again, and start normal smelting after there is no abnormality; if there is water, the dispatcher will notify the electrician to cut off the power supply to the converter. After the power outage, the electrician will monitor on duty on the spot, and the dispatcher will notify the production manager, safety officer and relevant person in charge to go to the site to organize the specific handling of the water accumulation fault.

(3) Treatment of water accumulation in the furnace: The production manager, safety officer and relevant person in charge and the head of the converter operation area should organize designated personnel to check the water accumulation in the furnace. Before the situation is clarified, it is strictly forbidden to move the furnace until there is no water accumulation in the furnace and the furnace can be moved only after more than two people confirm it.

(4) Observe the water accumulation in the furnace once every hour. After confirming that there is no water, throw in combustible items such as brooms and paper shells for observation. If it does not burn and does not indicate that there is still water in the furnace, the furnace temperature is too low. Continue to observe until it burns to confirm that there is no water accumulation in the furnace.

(5) Prepare to move the furnace. After confirming that there is no water in the furnace, the dispatch before moving the furnace should be approved by the supervisor. After the monitoring and safety officers confirm that all personnel around the converter have been evacuated, the dispatcher should notify the on-duty electrician to generate electricity.

(6) Move the furnace. When moving the furnace, the oxygen gun operator should shake it first and then shake it forward. After confirming that there is no abnormality, shake the furnace away from the smoke hood to ensure that the furnace cannot be flooded again.

(7) Confirmation and treatment of leaks. The on-duty dispatcher should organize and notify the maintenance personnel to check the water leakage of the oxygen gun, smoke hood, flue and furnace mouth water cooling system.

(8) Normal production. After the treatment is completed and it is confirmed that there is no water leakage, the dispatcher will issue normal smelting instructions to the team leader to ensure normal production.

Prevention and treatment of water accumulation in the converter

(1) Check and replace aging equipment in time.

(2) Improve the operation level of the converter to avoid the oxygen gun position being too low for a long time.

(3) Improve the operation level of the furnace dismantling machine driver to reduce the installation friction between the furnace mouth water tank.

(4) Check the cooling water of the equipment frequently. If the cooling water of the equipment is found to be insufficient, notify the person in charge of the operation area in time.

(5) When pouring out steel, reasonably control the pouring angle and strictly prohibit the molten steel from overflowing into the furnace mouth water tank.

Why is water accumulation in converters considered one of the most dangerous safety hazards in steelmaking production?

A: Primarily due to the risk of steam explosion.
When liquid water comes into contact with molten steel or slag at temperatures exceeding 1600°C, the water instantly vaporizes, expanding its volume by approximately 1000-1600 times. In the semi-enclosed space of a converter, this instantaneous surge of pressure can lead to a violent explosion, damaging not only the furnace and surrounding equipment but also seriously threatening the lives of on-site operators.

What are the common sources of water accumulation in converters?

A: Water accumulation mainly comes from the following channels:
Oxygen lance leakage: A ruptured oxygen lance nozzle or cooling water pipe allows cooling water to directly enter the furnace.
Furnace opening/fume hood cooling system: Leaks due to damage to the furnace opening water-cooled components or the flue cooling wall.
Damp raw materials: Scrap steel and bulk materials (such as lime and lightly calcined magnesia balls) added to the furnace contain a large amount of moisture due to improper storage.
External seepage: Leaks in the plant or burst cooling water pipes in the surrounding area can cause water to enter the furnace.

What physical and chemical damage does water accumulation cause to the furnace lining (magnesia-carbon bricks)?

A: Water accumulation not only poses an explosion risk but also severely reduces the lifespan of the furnace lining:
Hydration: The main component of magnesia-carbon bricks is magnesium oxide (MgO), which readily reacts with water vapor to form magnesium hydroxide [Mg(OH)₂], leading to expansion, loosening, and cracking of the bricks.
Thermal shock damage: Water droplets contacting the high-temperature brick surface can cause a sharp drop in local temperature, and the resulting thermal stress can cause the refractory material surface to peel off.

How to promptly identify potential water leaks or accumulation in the converter during on-site operation?

A: Monitoring the following signs is crucial:
Pressure and flow monitoring: Abnormal fluctuations or increased differences in the inlet and outlet pressure and flow rate of the oxygen lance or furnace mouth cooling water.
Abnormal smoke: Abnormal dense white smoke (water vapor) appears at the furnace mouth.
Abnormal Sounds: Unusual noises or “pops” are heard inside the furnace.
Flame Inspection: The flame color at the furnace opening is abnormal, or dampness is observed on the furnace bottom/wall during non-blowing periods.

What are the emergency procedures and preventative measures after water accumulation in the converter?

A: The principle of “safety first, no blind operation” must be followed:
Emergency Shutdown: Immediately stop blowing, cut off the oxygen supply, raise the oxygen lance to its highest position, and shut off its cooling water.
Draining Water: Under safe conditions, attempt to drain the water by slowly shaking the furnace body, or slowly bake out the steam using residual heat.
No Adding Material: Do not add scrap steel or molten iron until the water has been completely drained.
Prevention is Key: Strengthen regular flaw detection of the oxygen lance and water-cooled components, ensure the raw materials entering the furnace are dry, and keep the plant’s drainage system unobstructed.

LMM YOTAI established in 2007. Our production technology comes from Japanese Yotai. As an experienced and international player in the refractories industry. We have succeeded in expanding both the breadth of its product range and the depth of its services. From raw material selection, refractory portofio & optimization, installation & services & recycle of used refractories on site to further reduce client’s Opex & Capex in refractory consumption per ton steel output, meanwhile improve product quality of client.

Our Product have been supplied to world’s top steel manufacturer Arcelormittal, TATA Steel, EZZ steel etc. We do OEM for Concast and Danieli for a long time

Facebook
LinkedIn
Pinterest
Reddit

Comprehensive solution of Refractory for steelmaking

Fill out the form below, and we will be in touch shortly.
Contact Information