The demand for medium frequency induction furnace technology in the field of metal hot processing is increasing. The medium frequency furnace uses the principle of electromagnetic induction during operation, which is more energy-saving and environmentally friendly than traditional coal-fired furnaces. In the later use of the medium frequency furnace, basic maintenance and management are required to avoid the equipment failing to start normally, abnormal sounds, thyristor burnout, etc.
Charging principle of medium frequency induction furnace smelting
Charging of induction furnace smelting is the basis for ensuring the smooth progress of the melting process. Unreasonable charging will cause many problems such as extended melting period, increased metal loss, and increased power consumption. Therefore, sufficient attention must be paid to the charging work.
(1) Bottom slag: After the crucible is cleaned and maintained, bottom slag should be added. Lime and fluorite slag are added during alkaline crucible smelting; broken glass slag is added during acidic crucible smelting. Ensure that the slag layer covers the molten steel during the melting period.
(2) The tightness of the charging The charging requires tightness at the bottom and looseness at the top. That is, the stacking density in the middle and lower parts of the crucible should be as large as possible to improve the heating efficiency (the density of magnetic lines in the middle and lower parts is the highest). The stacking density in the upper part is small, which facilitates the smooth downward movement of the charge during melting and reduces the probability of bridging.
(3) Loading layer
1) The bottom is the low-temperature zone of the crucible, and should be loaded with easily fusible charge such as medium and high carbon steel blocks, high carbon iron alloys, electrolytic nickel blocks, ferromanganese, ferrosilicon, and copper and manganese metals.
2) The middle is the high-temperature zone of the crucible, and should be loaded with refractory charge with high melting point and high density such as tungsten iron, molybdenum iron, micro-carbon ferrochrome, low-carbon ferrochrome, niobium iron, and tungsten, molybdenum, niobium, chromium, cobalt and other metals.
3) The upper part is the low-temperature zone of the crucible, and should be loaded with steel, industrial pure iron, etc.
4) Loading of return materials: large and heavy materials are loaded into the middle and lower part of the crucible, and light and thin materials, bundles, and packaging materials are loaded into the upper part.
(4) Charge size, density and melting point The size of charge depends on the furnace capacity and power frequency. In principle, large charge can be used in low frequency and large capacity furnaces; smaller charge can be used in high frequency and small capacity furnaces. Charges with high density and high melting point, such as ferro-tungsten, ferro-molybdenum, and micro-carbon ferro-chromium, must be broken into smaller pieces. Charges with high density and low melting point are allowed to use larger pieces.
Daily maintenance methods for medium frequency induction furnaces
(1) Check and clean the radiator to maintain efficient cooling effect, and pickle if necessary.
(2) Check whether the water cooling system is blocked or leaking, whether the water pressure relay is sensitive, and the inlet water temperature difference should generally not be greater than 35°C. The medium frequency power supply, induction coil, water cable, etc. all need water for cooling, so water is essential for furnace equipment. The probability of furnace equipment damage caused by cooling water failure is high. Because most of the cooled devices are charged bodies, such as thyristors, induction coils, water cables, etc., the conductivity of the cooling water that directly cools these devices must be lower than the specified value, and the connecting hose must be a carbon-free rubber hose. In addition, the inlet temperature, outlet temperature, water pressure and flow rate of the cooling water must meet the design requirements. The cooling water system of the electric furnace is equipped with various sensors to monitor the relevant parameters of the cooling water. When the cooling water parameters are abnormal or exceed the set value, an alarm will be issued or the equipment will be stopped.
The cooling water pump station of the medium frequency electric furnace must be equipped with two main water pumps of the same specifications (one for use and one for backup), and must be equipped with an emergency cooling water system. When the main water pump cannot work due to power outage, the emergency cooling water system can provide cooling for the furnace body to avoid damage to the furnace body.
(3) Check the insulation of the induction coil and whether there is any water leakage.
(4) Check whether the wires and switches are damaged.
(5) Check and clean the sink, check the drain valve, and remove a certain amount of sewage to prevent scaling.
(6) Clean the oil and dust of various electrical components and other equipment, and use a fan or air pump to clean the dust.
(7) Check whether the wiring screws are tightened to ensure good contact.
(8) Check whether the thyristor, electrical circuit busbar, transformer and each line segment are overheated.
(9) Hydraulic system The hydraulic system of the medium frequency coreless induction furnace is used to tilt the furnace to pour out the molten metal and open and close the furnace cover. To ensure reliable operation, the hydraulic station of the electric furnace should be equipped with two main pumps of the same specifications (one for use and one for backup). A throttle valve should be installed at the inlet end of the tilting hydraulic cylinder to prevent the furnace body from falling suddenly due to loss of pressure in the hydraulic system. In the case of a long power outage, the molten metal in the electric furnace may cool and solidify, which may damage the furnace lining. It is very dangerous to melt the solidified metal in the furnace by running the electric furnace. Therefore, the hydraulic system of the electric furnace should be equipped with an emergency system. When the power supply of the power grid is interrupted, if necessary, this emergency system can be used to pour out the molten metal in the furnace to prevent it from solidifying in the furnace.
(10) Ground leakage furnace monitoring: alarm During the operation of the coreless medium frequency induction furnace, if the furnace lining is damaged, it will cause a furnace leakage accident. If the molten metal leaks from the furnace lining, it will damage the insulation, coil support and yoke of the induction coil. If it is not discovered in time, it will cause serious leakage. If the molten metal burns the copper tube of the coil, the water in the tube will contact the molten metal and cause an explosion, resulting in a serious accident. It can be seen that it is absolutely necessary to set up a furnace lining leakage alarm system. The better one at present is the DC injection type leakage alarm system. The center point of the secondary side of the transformer is not grounded, so a DC circuit can be connected in parallel to the AC power supply circuit of the induction coil. The molten metal in the furnace is grounded through the furnace bottom electrode, and the induction coil is connected in series with the DC power supply and milliammeter and grounded. Therefore, the molten metal, furnace lining, coil and milliammeter are connected to form a DC circuit. When the furnace lining is in good condition, the milliammeter display value is very small due to the large resistance of the furnace lining; if the furnace lining is in poor condition and molten metal penetrates into the furnace lining and approaches the induction coil, the resistance of the furnace lining will decrease and the indication value of the milliammeter will increase. When the current value exceeds the set value, an alarm will be issued and the main power supply will be cut off, thus preventing the occurrence of leakage accidents.
(11) Automatic fault diagnosis: Modern induction furnaces are equipped with a computer management system. This system has an automatic fault diagnosis function. The system scans each setting point of the equipment. When the parameters of the setting point are found to be abnormal, an alarm will be issued and the fault information can be displayed and recorded. Since the scanning speed is very fast, reaching hundreds of times per minute, the fault will be discovered in its initial state, so that the fault will not cause serious equipment damage. The relevant information about the fault will be stored in the computer for future reference.
Medium frequency induction furnaces are widely used in real life, which is inseparable from their good maintenance methods.
First of all, do a good job of inspection before starting, especially for the furnace lining, check whether it is intact, and inspect cracks, furnace mouth, erosion, furnace nozzle, etc. to ensure normal startup.
Secondly, before putting in pig iron, the amount of scrap steel to be put in should be determined according to the impact degree of pig iron on the furnace bottom. Carbon enhancer, scrap steel and return to the furnace can be added after the iron is melted.
10 points to note when using a medium induction furnace
(1) A medium frequency induction furnace should use a dedicated rectifier transformer to increase the power supply voltage and limit the no-load operation of the transformer.
(2) Standardize the installation, shorten the connection between high voltage, transformer, medium frequency power supply, and furnace, and select T2 copper or oxygen-free copper with higher purity, especially the induction coil and water-cooled cable. Increasing its cross-sectional area can effectively reduce the current heat loss.
(3) Select a medium frequency furnace with appropriate capacity and frequency according to the casting process, increase the power density to improve the melting efficiency, and reduce additional losses.
(4) Give priority to steel shell furnaces with furnace covers to reduce heat loss and electromagnetic loss at the furnace wall and furnace mouth. The connection between the furnace body and the outer shell prevents metal contact from forming a short circuit during operation.
(5) Develop a reasonable casting process, standardize process operations from modeling, material selection, melting, pouring, heat treatment, cleaning, etc., and manage scientifically to reduce energy consumption.
(6) Strengthen equipment management and maintenance, reduce failure rates, and ensure smooth production.
(7) Check the connection parts of each conductive system for good contact, especially the screws at the connection between the water-cooling cable and the induction coil. The insulating platform and insulating boots must be inspected once a year.
(8) It is strictly forbidden to cut off power and water during the smelting process. During the smelting process, the outlet water temperature and water pressure should be paid attention to at any time to keep the water pressure at 0.1-0.3MPa and the outlet water temperature below 55°.
(9) When adding materials, the cold and wet furnace charge should be dried first and cannot be directly added to the molten metal. It is best to avoid using metal chips when using the first furnace because metal chips can penetrate the gap of the furnace lining. The furnace must be heated to about 1000℃ before pouring in the molten iron. The heating of the furnace can be heated by induction heating of iron blocks.